From an owner's standard to the IFC model, on one record
Each module reads and writes the same ledger of statements, rules and decisions. A figure changes in one place, and every drawing that depends on it moves with it.
Seven bands, one contract
The Akira Architecture
The Akira pattern underneath the product: decisions, ontology, agents and the control plane.
PRODUCT SURFACE
Design
Text‑to‑CAD
Operate
Agentic Ops
SHARED MEANING
Ontology Layer
PLATFORM SERVICES
Data Services
Model Services
Agent Services
Workflow Services
CONTROL PLANE
Security & Governance Layer
Software Delivery Layer
- AKIRA PLATFORM
- DIGITAL TWIN
- AGENT MODULES
- CAD / BIM / DCIM
Keystone
The Ontology Layer
A shared model of the business that data, models and workflows all resolve against.

Without it, every agent invents its own private view of the world — and no two answers reconcile.
Objects
Vessel, work order, patient, claim, SKU — the nouns the business argues about.
Links
How those nouns relate, so a question can traverse instead of join.
Actions
The finite set of changes anyone — human or agent — is permitted to make.
Branches
A safe copy of reality for simulation, review and rollback.
Worked example / AI data center
Ontology in Practice
| Object | Linked to | Permitted action |
|---|---|---|
| Rack | Hall, PDU, cooling loop, GPU cluster | Redistribute load |
| Work order | Rack, technician, spares, SLA | Raise, reassign, close in CMMS |
| Cooling loop | CDU, chiller, CFD model, setpoint | Adjust setpoint within envelope |
| Design revision | CAD model, BIM objects, code clauses | Generate compliant layout |
| Compliance item | Standard, evidence, auditor | Produce audit‑ready report |
Runtime
The Agentic Execution Loop
Every cycle is bounded, logged and reversible.

STEP 01
Observe
Read the objects in scope and the events that changed them.
STEP 02
Reason
Plan against a goal, calling models and solvers as tools.
STEP 03
Act
Invoke a declared action, at the autonomy level granted.
STEP 04
Verify
Check the outcome against the ontology, then widen or revoke scope.
The governed workflow
Eight stages, one record
Every stage reads the same ledger of statements, rules and decisions, so the figure set in the brief is the figure the schematic draws.
Business case & OPR
The owner's project requirements, captured as statements with their author.
Site due diligence & feasibility
Site screening, power and connectivity, and the ground the building stands on.
Concept design
The capacity chain, halls, floors, plant and envelope, derived from what is stated.
BOD issued Rev 0
The Basis of Design by discipline: every criterion stated, to be decided, or outside.
Schematic design
Single-line, cooling, network, lighting, fire and structure sheets, and the LOD 300 model.
Detailed design & tender
Contractor proposals and bids read against the Basis of Design.
Construction & commissioning
The record that construction and commissioning are checked against.
Operations & change control
Every change logged against the design it changes.
01
Standards and rules
The standard is the input. Akira compiles it into rules a machine can evaluate, and keeps every rule tied to the words it came from.
The owner's own pack
Each owner's design rules are a pack of their own, laid over Akira's practice pack. A rule the owner states wins; a rule the owner has not stated falls through to Akira's assumption and is cited as one.
Rules with their clause and quote
Every rule carries its value, its unit, its locator in the document and the verbatim text it was read from, so a finding can always show its source.
Conflicts and gaps
Where two clauses disagree, or the standard is silent, the item lands on a register with an owner, to be resolved, logged as a departure, or sent back as a rules change request.
Any owner's standard
The compiler is general: a new owner's standard onboards as a new pack, rather than as code written for one document.
02
Concept design
A first concept from three answers, then a sheet where every figure shows how it was resolved.
Capacity chain
Racks, IT load per hall, facility load, heat rejection and plant duty, each shown with its formula.
Quick Brief
The capacity, the cooling route and the site. Everything else a first concept needs is proposed from the practice pack, each proposal with its arithmetic and the sheet that replaces it. A site nobody has named is a placeholder, labelled as one.
Design Parameters
The concept as a sheet. Each figure is confirmed by a citation, assumed on the record, derived by the standard's own formula, or open, and open is the work still to do.
Create Data Centre Building
The brief as criteria, each with its source chip. Derive draws the building on its site with the metrics and their basis beside it.
Options are files
A design option is a file that extends the project's inputs. Adding one produces a full drawing and model set, with no code change and no figure typed into a generator.
03
Schematic design
Discipline by discipline, Akira draws what the concept implies, and marks every rating stated, derived or open.
Single-line diagram
Every pairing says whether it is stated, assumed or open.
Cooling loop
The stated cooling case, with installed capacity per hall.
Network topology
MDF, meet-me rooms and the hall fabric.
Lighting control
Zones, controllers and gateways; counts only where stated.
Fire protection
Zones and release panels; suppression open until stated.
Structure
Setting-out and loads; no member size and no check claimed.
IFC4 · LOD 300
The design model, authored from the same derivation
Typed products with provenance property sets, footprint-only wherever no height is stated.
04
Design assurance
Other people's documents and models, read against the Basis of Design. A model reads; a reviewer decides.
BOD Checker
A maker and a checker per discipline, each finding with the clause it rests on, and a what-if recomputed in code rather than guessed.
IFC and model checking
An incoming model read back against the rules: what it contains, what is unplaced, and what no rule could check.
Contract review
An issues log and a redline schedule, with tracked changes only where a reviewer wrote the replacement wording.
Contractor proposals
Bids read against the Basis of Design, with clarification questions drafted for a reviewer to approve or rewrite.
05
Agentic operations
The building, once it runs. Two products on one record: an AI CMMS for maintenance and an AI DCIM for the data centre's power, cooling and space. Agents draft and prepare; people confirm, approve, sign and close.
The AI CMMS and AI DCIM run on Akira's own demo environment, on simulated plant and a 50 MW concept building. No customer deployment, no live BMS or meter, no pilot.
AI CMMS
A fault is reported in plain words and an assistant drafts the work order: site, location, asset, trade, priority, and the response and rectification times from the client's contract. Technicians work it on their phones: acknowledge, check in, a checklist with photos, pending with a reason, signatures, a service report, offline. Supervisors or engineers verify. Preventive schedules raise their own jobs ahead of due dates, checklists attached. Every work order is created and tracked in one system of record.
AI DCIM
The layout and the power and cooling chain live in the DCIM record; maintenance lives in the CMMS; one workspace joins them. A site overview with capacity and redundancy as it stands. Floor maps drawn from the rack records, with a time-lapse of the last 24 hours of rack inlet temperature. Hall and rack detail. A power chain that shows what feeds what, and what depends on any unit. Power budgets from measured load. Maintenance windows with their impact, a clash check and approvals. Alarms that become work orders by stated rules.
Connectors
SNMP, Modbus, BACnet, MQTT, WebSocket and REST, a plant simulator, and a read-only MCP server so other agents can read the DCIM. The drivers have been exercised against the simulator only; no real BMS or meter is connected anywhere yet.
From the design to operations
Shown at the scale of a 50 MW concept building: 15 halls, 4,167 racks, 26 generators and 19 chillers, loaded from a design brief's preview in Akira. These are concept figures from the design, not a site. Automated import from the design is planned; today it is a seed script.
Planned
A Contract Assistant that proposes a preventive-maintenance plan from a term contract; parts stock deduction; run-hour based preventive maintenance; permit-to-work beyond a text field; a floor-plan editor in the DCIM.
Three screens from Akira's demo environment on a simulated plant, 12 October 2026. No customer site is shown.



The agents, and what each never does
Fault Assistant
Reads a fault in plain words or a pasted email, matches the site, location and asset on record, picks the trade, sets the priority and the SLA from the contract's rules, suggests a technician by load, and drafts the work order. Nothing is created until you confirm.
Ask Akira
Answers questions from the DCIM and CMMS records: readings, the impact of an outage, where equipment fits. Never writes, records or confirms.
Alarm-to-work-order rules
Critical or major still active after two minutes: an urgent work order to the trade's team, assigned to the technician with the fewest open jobs. Minor: a normal work order. Cleared within two minutes: logged only. A repeat on the same equipment joins the open work order. Never closes a job, never changes an SLA.
Power budget
The 95th percentile of each inlet's hourly peaks plus 20% headroom, never above nameplate; an inlet with under seven days of readings keeps its booking. A person applies the result to the DCIM record.
06
What you take away
Open formats your team and your tools already read.
| Output | Format | What travels with it |
|---|---|---|
| Design model | IFC4 | Provenance property sets on every product |
| Drawing sheets | DXF · PDF · SVG | Open and assumed items named on the sheet |
| Design option | JSON | Each figure's note: stated, proposed or placeholder |
| Issues log | XLSX | The clause and quote behind each issue |
| Redline schedule | DOCX | Tracked changes in the reviewer's own wording |
See the platform on your own standard
Access is by invitation while the platform is gated. Tell us about your project and your standard.